FUHRMANN Engineering Inc. (FEI) provided topographic surveying, field design assistance. Contract 72B58 involved the removal and reconstruction of the IL 104 Bridge over the Illinois River at Meredosia, Illinois. FEI provided construction layout of bridge control for a 10 span 2,128 foot long bridge, 1,300 feet of Mechanically Stabilized Earth (MSE) Wall, a pump station with underground storage area, and curb & gutter and storm sewer through the City of Meredosia.