RETURN TO PROJECT PAGE

MICHELE CLARK HIGH SCHOOL ROOF TOP UNITS AND SLAB SEPARATION

Type
Government
SERVICE PROVIDED
Structural Engineering
MARKET SECTOR
Facilities

FUHRMANN Engineering Inc. (FEI) provided Structural Engineering services to review and support development of plans for a new RTU. Additional repairs were required. Currently, existing building drawings for the roof are not available. FEI performed a site visit to field measure the existing conditions and develop a drawing of the rook plan for the building. The Building Manager will provided required access and equipment to measure the existing members and spacing. FEI performed a site visit to the project which is located in City of Chicago.

FUHRMANN ENGINEERING INC (FEI) provided services consisting of the following:

  • Site visits and field measurement of the existing roof framing
  • Prepared roof plans and calculations for permit and construction.