FUHRMANN Engineering Inc. (FEI) provided Phase III engineering services for the construction contract for roadway, bridge reconstruction embankments, MSE walls, and widening on the Jane Addams Memorial Tollway between Mile Post 73.3 (Oakton Street) to Mile Post 76.6 (Mannheim Road) in Cook County, Illinois.
Work included performing on-site construction inspection and surveying, traffic control inspection, reviewing layout of contract including design changes, preparing records, and maintaining documentation.
Roadway and Bridge Reconstruction, Jane Addams Memorial Tollway, I-90 from M.P. 73.3 (Oakton Street) to M.P. 76.6 (Mannheim Road); Outside lanes constructed in 2015; Inside lanes under construction in 2016.