FUHRMANN Engineering Inc. (FEI) provided Phase III construction services for the High Speed Rail corridor from St. Louis to Dwight, Illinois.
Fuhrmann provided observation of the following rail construction activities:
- TRT – Including completion of all surface and crossing work.
- Complete building panels in Pontiac, IL.
- Verification of Switch serial numbers and locations.
- Building of track panels in Normal, IL – Mulberry & Beech Streets.
- Building of track panels in Dwight, IL – Washington, Chippewa & S Depot Pedestrian crossings.
- Installation of track panels in Pontiac, IL – Washington, Madison, & Howard.